TM 9--2350--292--20--2FINAL DRIVE HUB AND SPROCKET REPLACEMENT -- CONTINUED0397 00Installation--Continued10. Remove final drive lifting sling and wire rope assembly from suitable lifting device and from final drive hub (5).11. Torque 12 screws (7) to 700--750 lb--ft (940.2--1017.0 NSm). See Diagram 2 for torque sequence.CAUTIONDo not re--torque bolts without first applying primer andadhesive. Failure to comply could result in equipmentdamage.12. Coat mounting surface of outer sprocket (4) and 11 screws (2) with lubricant.13. Install outer sprocket (4) on final drive hub (5) with 11 screws (2), 11 tapered bushings (3) and 11 new self--lockingnuts (1). Torque 11 screws (2) to 225--250 lb--ft (305--339 NSm) and 11 new self--locking nuts (1) to 70--90 lb--ft(95--122 NSm). See Diagram 3 for torque sequence.Figure 187234751DIAGRAM 3DIAGRAM 2NOTEFOLLOW--ON MAINTENANCE:Install left or right track (TM 9--2350--292--10)Install left or right hinged fender (WP 0443 00)END OF TASK0397 00--5/6 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business