TM 9--2350--292--20--2
0427 00--1
HOIST BOOM REST AND LATCH ASSEMBLY REPAIR
0427 00
THIS WORK PACKAGE COVERS:
Removal, Disassembly, Assembly, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Torque wrench (item 2, WP 0717 00)
Materials/Parts
Lockwashers (6) (item12, WP 0718 00)
Cotter pin (item 67, WP 0718 00)
Cotter pins (2) (item 17, WP 0718 00)
Equipment Conditions
Hoisting boom raised to full forward position
(TM 9--2350--292--10)
References
TM 9--2350--292--10
Removal
Remove six nuts (1), six lockwashers (2), 12 flat washers (3), six screws (4) and boom rest (5) from engine deck as-
sembly. Discard lockwashers.
Figure 205
1
2
3
3
4
5
FORWARD