TM 9--2350--292--20--2
0528 00--1
HOIST BOOM STAYLINE TREE REPLACEMENT
0528 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Slide puller (item 46, WP 0717 00)
Endless sling (item 23, WP 0717 00)
Suitable lifting device (250 lbs (113.5 kg) min cap)
Materials/Parts
Lockwashers (12) (item 2, WP 0718 00)
Hardwood lumber (item 4, WP 0716 00)
Antiseize compound (item 90, WP 0716 00)
Equipment Conditions
Boom raised and blocked
(TM 9--2350--292--10)
Stayline tree chain assembly removed
(WP 0525 00)
Personnel Required
Two
References
TM 9--2350--292--10
Removal
WARNING
Failure to block up boom may result in death or injury to
personnel.
1. Block tree with hardwood blocks.
2. Remove four screws (1), four lockwashers (2), four flat washers (3) and two brackets (4) from each of two tree
shoes (5). Discard lockwashers.
3. Remove two screws (8), two lockwashers (9), slotted washer (10), pin (11) and separate two tree shoes (5). Dis-
card lockwashers.
NOTE
Endless sling and suitable lifting device may be required
to replace tree shoes.
4. Remove cables (6 and 7) from two tree shoes (5).
5. Inspect parts for damage and replace as required.
Figure 283
1
2
3
4
5
5
6
7
8
9
10
11