TM 1-1680-320-13&P
0016 00
HIGH PERFORMANCE RESCUE HOIST ASSEMBLY
CABLE - INSTALLATION
INITIAL SETUP
Personnel Required: 1
References:
UH-1: 15N, Helicopter Repairer
AVUM/AVIM Manual for General Aircraft
UH-60: 15T, Helicopter Repairer
Maintenance TM 1-1500-204-23 series
Hoist Certified: 91W, Flight Medic
Aircraft Electrical and Electronic Manual
TM 1-1500-323-24 series
Parts/Materials:
Cleaning and Corrosion Control
Insulation Sleeving
TM 1-1500-344-23 series
Screw, AN3H26A
Tools and Special Tools:
Tool Set, Aviation Unit Maintenance
Tool Kit, Aircraft Mechanic
Cable Spool, 42277-730 or equivalent
Ground Power Unit (GPU)
WARNING
To avoid injury to personnel from broken wire strands, leather gloves must be
worn at all times when handling cable assembly.
CAUTION
Protect hoist cable from damage. Do not allow kinks or bends to occur.
NOTE
If drum has not been moved from original cable removal stop point proceed to
step 4.
1. Connect power (28 vdc) to hoist.
2. Position drum for cable installation using control pendant (position control pendant CABLE UP/DOWN switch
to UP) until drum has moved to breather side and begins returning to drum cover assembly side. Stop drum
rotation with cable retainer finger slot at 12 o'clock position with approximately 1/4 inch of drum flange visible.
3. Disconnect power.
CAUTION
Ensure heat shrink sleeve is not installed on drum end of cable.
4. Install cable through actuator arm and cable guard over sheave assembly.
5. Insert cable through cable cutter into boomhead support assembly.