TM 9-2350-238-34-2
6 Install safety relief valve (8) and two pipe
plugs (9) in winch reaction end support
(10),
7 Install winch reaction end support (10)
winch control end of planetary winch
drum (5).
on
8 Install carrier housing thrust washer bear-
ing (11) and new preformed packing (12)
on stage four carrier assembly (13).
2-123