TM 9-2350-238-34-2
2-46. MAINTENANCE
INSTALLATION (CONT)
7
8
9
10
11
12
13
OF TRAVERSING SYSTEM
Install three new Iockwashers (12) and
three hexagon capscrews (13). Torque
three screws to 270 to 300 ft-lb (366 to
407 N-m).
Install metal tube assembly (14)
Uncover tube openings and install tow
winch motor drain metal tube assembly
(15) and boom and tow winch motor
drain metal tube assembly (16) at
hydraulic drain tee (17) on traversing
hydraulic motor (18).
Uncover tube openings and install two
tubes (19 and 20) on traversing
hydraulic motor (18).
Uncover tube opening and install metal
tube assembly (21) to traverse brake
selector linear valve (22).
Install straight tube adapter (23) in oil
drain metal tube assembly (24).
Install oil drain metal tube assembly (24)
on cab traversing unit (11). Secure oil
drain metal tube assembly to cab deck
with loop clamp (25), new Iockwasher
(26), and screw (27). Torque screw to 9
to 10 ft-lb (12 to 14 N-m).
INSTALLATION (CONT).
2-226