CORRECTIVE ACTION Continued
5.
Reconnect wire 17 to rigger's SERVICE switch. Disconnect wire 16 from rigger's SERVICE light
switch. Place red lead of multimeter in wire 16 and black lead to ground. Turn MASTER switch ON,
press STOP LIGHT key and ENTER key on main light switch, and check for voltage. Turn MASTER
and main lighting switches OFF. If voltage is present, replace rigger's service lights switch (see WP
0173 00). If voltage is not present, go to step 6.
6.
Reconnect wire 16 from rigger's SERVICE light switch. Remove three screws (4), three lockwashers
(5), ground lead (6), and flat washer (7) and release main switch panel (8) from mounting brackets.
Disconnect switch panel to gage panel and miscellaneous switches wiring harness from main switch
panel. Place a jumper wire from pin N to socket N. Place red lead of multimeter in socket D of wire
75/16 and black lead to ground. Turn MASTER switch ON, press STOP LIGHT key and ENTER key
on main light switch, and check for voltage. Turn MASTER and main lighting switches OFF. If voltage
is present, repair/replace wire 16/75 of switch panel to gage panel and miscellaneous switches wiring
harness (see WP 0204 00 for dual voltage; 0205 00 for single voltage). If voltage is not present, go to
step 7.
0085 00-6