TM 9-2350-256-20-2
0190 00
Installation
1.
Connect connector (11) and lead (12) with screw (28) to APU voltage regulator (29).
2.
Connect connector (10) to bulkhead to APU, master relay, and rigger's lights wiring harness (27).
3.
Connect two connectors (8 and 9) to batteries (23) using bolt (25) and nut (26). Push insulator (24) back on battery terminal.
4.
Connect two connectors (6 and 7) to bulkhead to main engine bracket and rear fuel tank transmitter wiring harness (22).
5.
Connect connector (5) to main engine disconnect (21).
6.
Connect two leads (3 and 4) to slave receptacle (18) using lockwasher (21) and screw (19).
0190 00-5