CHAPTER 9: MAINTENANCE OF HULL-AND CAB-RELATED COMPONENTS TM 9-2350-256-209-76REPLACE/REPAIR SHIFTING CONTROLS AND LINKAGES-Continued2 Install lever (90), new lockwasher (89), and screw (88).3Install bell crank assembly (83) with flat washer (87), new lockwasher (86), bolt (85), and lubrication fitting (84).4Install two bell crank assemblies (76) to mounting brackets (77 and 78) with two grooved pins (82), four lubricationfittings (80 and 81), and two retaining rings (79).5 Install nut (75) and bearing (74) to each end of tube assemblies (69, 70, and 71).6 Install tube assemblies (69, 70, and 71) with new lockwasher (73) and screw (72) at each end.NOTELinkages must be completely installed and alined and rubber boot must be adjusted(see paragraph 9- 77) before cementing rubber boot in place.7 Install bushing (68), clamp (67), and rubber boot (65) to tube assembly (64). Install tube assembly to bulkhead(66).8Install nut (62) and rod end bearing (63) to each end of tube assembly (64).9Install new lockwasher (61) and screw (60).10 Install nut (57) and bearing (56) to each end of tube assembly (53). Install tube assembly with new lockwasher (55)and screw (54).11 Install six rollers (59) with six bolts (58).12 Install nut (52) and bearing (51) to each end of tube assembly (48). Install tube assembly with new lockwasher (50)and screw (49).9-166
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business