CHAPTER 15: MAINTENANCE OF M239 SMOKE GRENADE LAUNCHER SYSTEM TM 9-2350-256-2015-1 REPLACE/REPAIR M239 LAUNCHER POWER SWITCH BOX ASSEMBLY-Continuedb.DISASSEMBLY1Remove panel harness (8), four screws (9), and fourlockwashers (10).2Remove switch guard (11) and switch (12) byremoving two screws (13).3Remove light lens (14).4Remove indicator light (15) by removing two screws(16) and two lockwashers (17).5Remove identification (ID) plate (18) from enclosure(19) by removing four rivets (20).c.ASSEMBLY1Install ID plate (18) to enclosure (19) using four newrivets (20).2Install indicator light (15) with two screws (16) andtwo new lockwashers (17).3Install light lens (14).4Install switch (12) and switch guard (11) with two screws (13).5Install panel harness (8) with four screws (9) and four new lockwashers (10).d.INSTALLATION1Install mounting bracket (3) with two screws (6) andtwo new lockwashers (7).2Install switch box (2) to mounting bracket (3) withfour screws (4) and four new lockwashers (5).3Connect harness connector (1) to switch box (2).NOTEFollow-on maintenance:Install commander's plateand switch assembly (seeparagraph 16-5)15-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business