TM 9-2350-256-20
7
Remove two screws (14), two lockwashers (15), breather (16), two gaskets (17), and spacer plate (18).
8
Remove air duct hose (19) by removing hose clamp (20).
9
Remove two self-locking nuts (21), flange adapter (22), and gasket (23).
b. INSTALLATION
1
Install breather (16), two new lockwashers (15), two new gaskets (17), spacer plate (18), and two screws (14).
Tighten screws.
2
Install new gasket (23), flange adapter (22), and two new self-locking nuts (21).
3
Install air duct hose (19) by installing hose clamp (20). Tighten hose clamp.
4
Install air duct hose (12) by installing hose clamp (13). Tighten hose clamp.
5
Install tube (10) by installing hose clamps (11) at each end. Tighten hose clamps.
6
Install loop clamp (9) and washer (8) with new self-locking nut (7).
7
Install air duct hose (5) by installing hose clamp (6). Tighten hose clamp.
8
Install air duct hose (3) by installing hose clamp (4). Tighten hose clamp.
9
Install tube (1) by installing hose clamps (2) at each end. Tighten hose clamps.
NOTE
Follow-on maintenance:
Install powerplant (see paragraph 3-1)
Close exhaust doors (see paragraph 9-61)
Close transmission access door (see paragraph 9-55)
3-27