Home
Download PDF
Order CD-ROM
Order in Print
Installation (cont) - TM-9-2350-292-20-1_1093
Removal - TM-9-2350-292-20-1_1095
TM-9-2350-292-20-1 Carrier Ammunition Tracked M992A1(NSN 2360-01-362-3021) EIC:AE6 Manual
Page Navigation
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
TM 9--2350--292--20--1
0213 00--1
TURBOCHARGER DUST DETECTOR SYSTEM REPLACEMENT
0213 00
THIS WORK PACKAGE COVERS:
Removal, Installation, Operational Test
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0717 00)
Materials/Parts
Preformed packing (item 43, WP 0718 00)
Preformed packing (item 381, WP 0718 00)
Lockwashers
(3) (item 9, WP 0718 00)
Screw (item 387, WP 0718 00)
Electrical tiedown straps (AR) (item 382, WP 0718 00)
Equipment Conditions
Engine deck assembly removed (WP 0417 00)
NOTE
Dust
detectors
are mounted to the right and left turbo-
chargers. Both dust
detectors
are replaced in the same
manner. This task replaces the left turbocharger dust
detector system.
Removal
1. Disconnect wiring harness 3W202 connector 510L/GND (1) from pressure switch (2).
2. Remove electrical tiedown straps (3) from two hose assemblies (4). Discard electrical tiedown straps.
3. Remove two hose assemblies (4) from turbocharger (5).
Figure 23
FORWARD
1
2
3
4
4
5
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business