TM 9--2350--292--20--10264 00--1BILGE PUMP POWER LOAD RELAY, CIRCUIT BREAKER AND MOUNTINGPLATE REPLACEMENT0264 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (4) (item 58, WP 0718 00)Lockwashers (2) (item 132, WP 0718 00)Marker tags (item 49, WP 0716 00)Equipment ConditionsVehicle MASTER switch OFF (TM 9--2350--292--10)Battery power disconnected (WP 0256 00)ReferencesTM 9--2350--292--10NOTEPerform Removal steps 1, 2 and 6 and Installation steps4 and 5 for maintenance of bilge pump power load relay.Perform Removal steps 3, 4 and 6 and Installation steps2 and 3 for maintenance of circuit breaker.Tag all electrical connections and electrical leads prior toremoval to aid in the installation.Removal1. Disconnect wiring harness 4W136 connector P2 (1) from bilge pump relay (2).2. Remove two bolts (3), two lockwashers (4) and bilge pump relay (2). Discard lockwashers.Figure 781243
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business