TM 9--2350--292--20--10264 00--4BILGE PUMP POWER LOAD RELAY, CIRCUIT BREAKER AND MOUNTINGPLATE REPLACEMENT -- CONTINUED0264 00Installation--Continued4. Install bilge pump relay (2) with two screws (3) and two new lockwashers (4).5. Connect wiring harness 4W136 connector P2 (1) to bilge pump relay (2).Figure 781243NOTEFOLLOW--ON MAINTENANCE:Connect battery power (WP 0256 00)END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business