TM 9--2350--292--20--10264 00--3BILGE PUMP POWER LOAD RELAY, CIRCUIT BREAKER AND MOUNTINGPLATE REPLACEMENT -- CONTINUED0264 00Installation1. Install mounting plate (15) with two screws (13) and two new lockwashers (14).2. Install bilge pump circuit breaker (10) with two screws (11) and two new lockwashers (12).3. Install wiring harness 4W136 terminal T1 (8) and lead assembly 4W140 wire 450A (7) on bilge pump circuit break-er (10) with two lockwashers (6), two screws (5) and two lockwashers (9).Figure 7815141310111299556687
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business