TM 9--2350--292--20--1
0264 00--2
BILGE PUMP POWER LOAD RELAY, CIRCUIT BREAKER AND MOUNTING
PLATE REPLACEMENT -- CONTINUED
0264 00
Removal--Continued
3. Remove two screws (5), two lockwashers (6), lead assembly 4W140 wire 450A (7), wiring harness 4W136 termi-
nal T1 (8) and two lockwashers (9) from bilge pump circuit breaker (10). Retain attaching hardware for installa-
tion.
4. Remove two screws (11), two lockwashers (12) and bilge pump circuit breaker (10). Discard lockwashers.
5. Remove two screws (13), two lockwashers (14) and mounting plate (15). Discard lockwashers.
6. Inspect parts for damage and replace as required.
Figure 78
15
14
13
10
11
12
9
9
5
5
6
6
8
7