TM 9--2350--292--20--1
0091 00--3
MAIN WINCH FAILS TO OPERATE OR FAILS TO DEVELOP FULL POWER --
CONTINUED
0091 00
CONTINUED FROM STEP C
1. Remove gauges from hoist and main winch
directional control valve.
2. Install 0--5000 psi dial pressure gauge in filter
valve manifold port MS.
3. Install 0--5000 psi dial pressure gauge with
3/8--inch tee between front pump port X1 and
attaching hose.
CONTINUED ON NEXT PAGE
FORWARD
WARNING
D