TM 9--2350--292--20--20647 00--2AUXILIARY POWER UNIT LEAD ASSEMBLY 3W706 REPLACEMENT (HATZ)-- CONTINUED0647 00Installation1. Connect wiring harness 3W711 wire 62 (9) and lead assembly 3W706 (5) to generator terminal B+ (10) with newself--locking nut (7) and flat washer (8).2. Place a four--inch piece of insulation sleeving (11) over lead assembly 3W706 (5), then install lead assembly3W706 (5) to relay terminal A1 (6) with screw (1), two new lockwashers (2), new lockwasher (3) and nut (4).3. Apply adhesive to all exposed electrical terminals.4. Slide insulation sleeving (11) over relay terminal A1 and attaching hardware. Shrink insulation sleeving usingelectrical heat gun.12563478591011NOTEFOLLOW--ON MAINTENANCE:Install APU into vehicle (WP 0587 00)END OF TASK
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business