TM 9--2350--292--20--2
SMOKE GRENADE LAUNCHER ARMING SWITCH BOX AND LAMP
ASSEMBLY REPAIR -- CONTINUED
0671 00
Installation
1. Install lamp assembly (7) in switch box assembly (2) with two screws (10) and two new lockwashers (11).
2. Install new gasket (9) and lamp lens (8) on lamp assembly (7).
3. Connect wire 4W150 LMP (6) to lamp assembly (7).
4. Install switch box assembly (2) on bracket (5) with four screws (3) and four new lockwashers (4).
5. Connect wiring harness 4W108 connector P2 (1) to switch box assembly (2).
Figure 363
8
9
10
11
1
2
6
7
3
4
5
NOTE
FOLLOW--ON MAINTENANCE:
Connect battery power (WP 0256 00)
END OF TASK
0671 00--5/6 blank