TM 9--2350--292--20--20414 00--1AUXILIARY POWER UNIT AUXILIARY HOUSING REPLACEMENT0414 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Materials/PartsLockwashers (4) (item 2, WP 0718 00)Lockwashers (3) (item 12, WP 0718 00)Gaskets (2) (item 24, WP 0718 00)Equipment ConditionsAuxiliary power unit engine air duct removed (WP0620 00 or WP 0621 00)ReferencesTM 9--2350--292--10NOTEPerform Removal steps 1 through 5 and Installation steps1 through 4 for replacement of auxiliary housing.Perform Removal steps 2 through 5 and Installation steps1, 2 and 4 for replacement of exhaust hose.Removal1. Remove two screws (1), two lockwashers (2), exhaust tube (3) and gasket (4) from auxiliary housing (5).2. Remove three screws (6) and three lockwashers (7) securing auxiliary housing (5) to vehicle hull. Discard lock-washers.Figure 1981243567FORWARD
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business