TM 9--2350--292--20--2
0510 00--4
SPADE ASSEMBLY LUBRICATION HOSES, TUBES, FITTINGS AND
ADAPTER BLOCK REPLACEMENT -- CONTINUED
0510 00
Installation
1. Install two lubrication fittings (22) and two fitting assemblies (4) at spade cylinder link pivot points (5).
2. Install four elbows (20) in plate assembly (21).
3. Install four tubes (16) on four elbows (20) at plate assembly (21).
4. Install four lubrication fittings (19) in adapter block (18).
5. Install four adapters (17) in adapter block (18).
6. Connect four tubes (16) to four adapters (17).
Figure 268
18
17
16
20
20
16
17
16
20
4
4
17
16
17
19
5
5
20
21
22
22
o
VIEW
ROTATED 180