TM 9--2350--292--20--20546 00--1FUEL TRANSFER PUMP MOTOR AND PUMP BASE REPLACEMENT0546 00THIS WORK PACKAGE COVERS:Removal, InstallationINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Mechanical puller (item 43, WP 0717 00)Materials/PartsLockwashers (8) (item 2, WP 0718 00)Gasket (item 80, WP 0718 00)Woodruff key (item 60, WP 0718 00)Equipment ConditionsHydraulic lines and fittings removed from fuel transferpump motor (WP 0566 00)Fuel transfer pump removed (WP 0203 00)RemovalNOTENote the quantity and position of spacer plate(s) beingremoved to ensure spacer plate(s) are installed in thesame position.1. Remove four screws (1), four lockwashers (2), hydraulic motor (3) and spacer plate(s) (4) from pump base (5).Discard lockwashers.2. Loosen setscrew (6), remove sprocket (7), gasket (8) and woodruff key (9) from hydraulic motor (3). Discard gas-ket and woodruff key.NOTENote the quantity and position of shim(s) being removedto ensure shim(s) are installed in the same position.3. Remove four screws (10), four lockwashers (11), pump base (5) and shim(s) (12) from hull. Discard lockwashers.4. Inspect parts for damage and replace as required.Figure 295FORWARD391245678101112
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business