TM 9-2350-256-34
0068 00
8.
Using adapter and puller, remove boom pin (17) from hoisting boom assembly (18).
9.
Remove spacers (19).
10. Repeat steps 1 thru 8 for other side.
WARNING
Tie end of stayline cable assemblies (12) to hoisting boom assembly (18) to avoid injury to personnel.
11. Using sling, remove hoisting boom assembly (18).
NOTE
After powerplants are operable, start hydraulic system and exercise boom actuating cylinders through
their entire stroke to purge all air from cylinders.