TM 9-2350-256-34
0068 00
Installation
WARNING
Tie end of stayline cable assemblies (12) to hoisting boom assembly (18) to avoid injury to personnel.
1.
Attach sling to hoisting boom assembly (18) as near as possible to its balance points.
2.
Using sling, move hoisting boom assembly (18) into position.
3.
Install spacers (19) as required to adjust side play of hoisting boom assembly (18).
4.
Align pin holes with tapered drift and install boom pin (17) to hoisting boom assembly (18) using wood block and hammer.
5.
Install retainer (16), two lockwashers (15), and screws (14).
0068 00-5