TM 9--2350--292--20--1
0230 00--7
HYDRAULIC OIL COOLER AND RELATED PARTS REPAIR -- CONTINUED
0230 00
Installation--Continued
10. Install cooler hood assembly (15) with 10 new lockwashers (14) and 10 screws (13).
11. Install two adapters (5) with two new preformed packings (12) onto oil cooler (10).
12. Apply adhesive to new gasket (11).
13. Install new gasket (11) and oil cooler (10) with four screws (9), eight flat washers (8), four new lockwashers (7)
and four nuts (6).
14. Connect two hydraulic lines (4) onto adapters (5).
15. Connect two hydraulic line quick--disconnect couplings (3).
Figure 38
15
14
13
5
5
12
10
11
9
8
8
7
6
4
3
3