TM 9--2350--292--20--10230 00--6HYDRAULIC OIL COOLER AND RELATED PARTS REPAIR -- CONTINUED0230 00Installation1. Connect two hydraulic lines (34) onto bulkhead adapters (35).2. Secure two hydraulic lines (34) with new electrical tiedown straps (36) as required.3. Install two quick--disconnect couplings (33) onto two hydraulic lines (34).4. Install two quick--disconnect couplings (32) onto tees (16).5. Connect two hydraulic lines (31) onto tees (16).NOTELeft heat shield is installed with one new lockwasher andone screw.6. Install right heat shield (30) with two new lockwashers (29) and two screws (28).7. Install bracket (27) with two new lockwashers (26) and two screws (25).8. Connect two hydraulic lines (4) onto tees (16).9. Secure two hydraulic lines (4) and two hose sleeves (24) with two clamps (21), flat washer (20), new lockwasher(18), screw (19), nut (17) and four new electrical tiedown straps (23).Figure 38441617181920211621232323232424252627282930313132323333343435353622
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business