TM 9--2350--292--20--1
0230 00--5
HYDRAULIC OIL COOLER AND RELATED PARTS REPAIR -- CONTINUED
0230 00
Assembly
1. Install cooler support (58) onto shroud base (55) with five new lockwashers (57) and five screws (56).
2. Install mounting block (54) and rod mount (50) onto shroud base (55) with two flat washers (53), two new lock-
washers (52) and two screws (51).
3. Position hydraulic cooler door (49) and two clamps (48) into rod mount (50).
4. Apply sealant to two screws (47).
5. Secure hydraulic cooler door (49) in rod mount (50) with two clamps (48) and two screws (47).
6. Install rotary solenoid (43) on solenoid mount (44) with two new lockwashers (46) and two nuts (45).
7. Install rotary solenoid (43) and solenoid mount (44) on shroud base (55) with two new lockwashers (42) and two
screws (41).
8. Install hood (40) with 13 flat washers (39), 13 new lockwashers (38) and 13 screws (37).
Figure 38
37
37
37
38
38
38
39
39
39
40
41
42
43
44
45
46
47
47
48
48
49
50
51
52
53
54
55
56
57
58