TM 9--2350--292--20--1
0247 00--8
APU CONTROL BOX AND APU CONTROL BOX BRACKET REPAIR --
CONTINUED
0247 00
Assembly--Continued
11. Install lead assemblies 4W123--2 (32) to start switch (30) and 4W123--1 (31) to preheat switch (29).
12. Install two toggle switches (29 and 30) on enclosure assembly (19) with four screws (27) and four new lockwash-
ers (28).
13. Install extension (23) on rear panel (18) with four screws (24), four new lockwashers (25) and four flat washers
(26).
14. Connect wiring harness 4W725 (22) connectors to enclosure assembly (19) in accordance with Electrical Sche-
matic (FP--7).
15. Install wiring harness 4W725 (22) to extension (23) on rear panel (18) with four screws (20) and four new lock-
washers (21).
16. Install rear panel (18) on enclosure assembly (19) with four screws (16) and four new lockwashers (17).