TM 9--2350--292--20--2SUSPENSION HUB ASSEMBLY REPAIR -- CONTINUED0387 00Installation--ContinuedNOTEIf rolling torque is less than 45 lb--in (5.1 NSm) or morethan 75 lb--in (8.5 NSm) repeat installation steps 3through 9.10. Place a socket wrench socket on bushing (20) and use torque wrench (item 21, WP 0717 00) to rotate hub as-sembly (6), a rolling torque 45--75 lb--in (5.1--8.5 N•m) over one full rotation should be required.11. Install solid rubber wheels (WP 0386 00).12. Lubricate suspension hub assembly (WP 0187 00).NOTEEnd play is validated by applying a straight axial push--pull motion to hub assembly.If no end play is detected, do not readjust bearings. Ifend play is detected, repeat Removal step 1 and Installa-tion steps 3 through 13. This setting applies to usedbearings also.13. After five mile road test. Raise suspension hub (6) from track assembly (para 12--2) and check end play. No endplay should be present.Figure 179620END OF TASK0387 00--7/8 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business