TM 9--2350--292--20--20393 00--4ADJUSTING LINK AND COMPONENTS REPAIR (NEW CONFIGURATION) –CONTINUED0393 00Assembly -- Continued9. Apply lubricant to threads of lubrication fitting (20).10. Install lubrication fitting (20) in cylinder (12). Torque lubrication fitting to 3--7 lb--ft (4.0--9.5 N•m).11. Apply lubricant to threads of safety relief valve (18) and new preformed packing (19).12. Install safety relief valve (18). Torque safety relief valve (18) to 3--7 lb--ft (4.0--9.5 N•m).13. Install new preformed packing (19) on plug (17). Apply sealing compound to threads of plug (17) and install plug(17) in cylinder (12).14. Apply lubricant to threads of pressure relief valve assembly (15) and new preformed packing (16).15. Install pressure relief valve assembly (15) with new preformed packing (16) in cylinder (12). Torque pressure reliefvalve assembly to 40-- 60 lb--ft (54.2--81.4 N•m).16. Apply lubricant to new preformed packing (14).17. Install grease bleed valve assembly (13) with new preformed packing (14) in cylinder (12).18. Apply sealing compound to threads of two pipe plugs (11).19. Install two pipe plugs (11) in cylinder (12).Figure 184A1314151612111819171120
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business