Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Removal - TM-9-2350-292-20-2_937
Cleaning - TM-9-2350-292-20-2_939
TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
897
898
899
900
901
902
903
904
905
906
907
TM 9--2350--292--20--2
0602 00--1
AUXILIARY
POWER UNIT
CRANKCASE OIL FILL LINES REPLACEMENT
0602 00
THIS WORK PACKAGE COVERS:
Removal, Cleaning, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers
(2) (item 10, WP 0718 00)
Lockwasher (item 110, WP 0718 00)
Gasket (item 143, WP 0718 00)
Dry--cleaning solvent (item 1, WP 0716 00)
Sealing compound (item 16, WP 0716 00)
Adhesive (item 25, WP 0716 00)
Equipment Conditions
APU removed from vehicle (WP 0586 00)
APU
crankcase
oil drained (WP 0187 00)
Personnel Required
Two
Removal
1. Remove screw (1), lockwasher (2) and clamp (3) holding oil filler tube assembly (4). Discard lockwasher.
2. Disconnect hose assembly (5) from elbow (6). Disconnect other end of hose assembly (5) from elbow (7) at oil
filler tube assembly (4).
Figure 334
1
2
3
4
5
7
6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business