TM 9-2350-238-34-22-20. MAINTENANCE OF WINCH LEVEL WIND AND CONNECTING LINK SLIDE(CONT).DISASSEMBLY (CONT)NOTE19 Remove two level wind sensing pushRotate cable guide to allow for re-stitches (53) with attached parts frommoval of spring pin.level wind bracket (54).14 Using hammer and punch, remove spring20 Remove two female terminal assembliesPin (42) from manual control lever (43).(55), two bushing sleeve insulators (56),15 Remove manual control lever (43), sleevespacer (44), and helical spring (45), fromshaft of cable guide (37).16 Using soft-faced hammer, remove cableguide (37) and two thrust washer bear-ings (46).17 Using arbor press, remove two needleroller bearings (47) from level wind hous-ing (10).18 Remove machine screw (48), Iockwasher(49), chain assembly (50), quick releasepin (51), and sleeve bushing (52) fromcable guide (37).and two electrical shells (57) from eachlevel wind sensing push switch (53).21 Remove three nuts (58), three lock-washers (59), three flat washers (60),three hexagon head capscrews (61), andlevel wind bracket (54) from level windhousing (10).22 Remove two sleeve bearings (62) fromlevel wind housing (10).23 Remove lubrication fitting (63) from levelwind housing (10).24 If damaged, remove three inserts (64)from level wind housing (10).2-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business