SECTION I: PRE-INSTALLATION PROCEDURESTM 9-2350-256-206 Inspect main engine air induction hoses, APU air induction hose, main engine generator air induction hose,and main engine exhaust cooling hoses. Replace any item found defective.7 Inspect cover and gasket on armature and master relays for possibility of leakage. Replace if necessary.8 Inspect waterproof electrical connections for possibility of leakage. Replace if necessary.9 Inspect personnel door seals for watertight fit. Replace if necessary.10 Inspect caliber .50 machine gun cover for tears or damage. Replace if necessary.11 Operate engine and troubleshoot any malfunction or deficiency as required (see Chapter 2, Section IV).l - 3 T E S T1 Check release torque of main engine cooling fans (see paragraph 5-2).2 Check batteries to see that they are fully charged and properly filled with electrolyte. Also, check battery capsfor tightness; battery vents, however, must be open.l-4 LUBRICATIONLubricate vehicle in accordance with TM 9-2350-256-10 and Appendix J.SECTION II: INSTALLATION PROCEDURESPara. TaskI-5I-6I-7I-8I-9PageAPU ...............................................................................................................................................................Engine Generator Cooling Exhaust..I-3I-55......................................................................................................................Engine Exhaust Pipe Supports................................................................................................................................I-7Engine A i r Inlet Pipes...............................................................................................................................................I-8Fuel Tank Vent...............................................................................................................................................I-9I-10 Acetylene Vent..............................................................................................................................................I-9I-11 Crew Fan and Boom Boot Drain Shutoff Clamp................................................................................................I-10I-12 Bilge Pump...................................................................................................................................................I-10I-13 Fire Extinguisher Nozzles and Electrical Connections in Engine Compartment.. ........................................ I-12I-14Caulking Exterior Fire Extinguisher Remote Control .......................................................................................I-12I-15 Other Applications of Caulking Compound ...................................................................................................... I-13I-16 Armament Protection.............................................................................................................................................I-14I-17 Sealing Inspection...................................................................................................................................................I-14NOTE•Items removed for installation of kit and not reused should be stowed for reinstallation when kitparts are removed.• Personnel heater and APU are not operational during fording operation. Air inlets and exhaustsfor both components are plugged and must be unplugged after fording operation to becomeoperational.I-5 APU1 Remove APU access cover (see paragraph 9-49).Change I l-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business