TM 9--2350--292--20--2
0634 00--6
AUXILIARY POWER UNIT GENERATOR REPLACEMENT -- CONTINUED
0634 00
Installation--Continued
9. Install two wires (3 and 4), three new lockwashers (2) and nut (1, supplied with generator) on terminal E of gener-
ator (5).
10. After generator leads are installed, apply adhesive to all exposed electrical terminals.
11. Connect APU ground hop kit (WP 0588 00) and start APU (TM 9--2350--292--10). After APU is started check APU
generator gauge to make sure generator is operating properly.
Figure 343
3
2
4
5
2
1
NOTE
FOLLOW--ON MAINTENANCE:
Install APU hydraulic pump (WP 0547 00)
Install APU engine support (WP 0590 00)
END OF TASK