TM 9--2350--292--20--2
0408 00--2
SHIFTING CONTROL LINKAGES ADJUSTMENT -- CONTINUED
0408 00
Adjustment--Continued
2. Position shift control assembly (5) in neutral position (TM 9--2350--292--10).
3. Remove screw (6) and lockwasher (7), disconnect tube assembly (8) from remote control lever (9). Discard lock-
washer.
4. Install welding electrode (10) in remote control lever (11).
NOTE
All rod, tube, and stud assemblies are adjusted in the
same manner: loosen two nuts and turn bearing on each
end one direction to increase the length or the other
direction to decrease the length.
Both ends of the rod or tube assembly must be adjusted
equally.
5. Adjust tube assembly (8) until tube assembly (8) can be connected to remote control lever (9).
6. Connect tube assembly (8) to remote control lever (9) with screw (6) and new lockwasher (7).
7. Remove screw (12) and lockwasher (13), disconnect stud assembly (14) from remote control lever (15). Discard
lockwasher.
8. Insert welding electrode (16) in remote control lever (17), adjust stud assembly (14) until stud assembly (14) can
be connected to remote control lever (15).
9. Connect stud assembly (14) to remote control lever (15) with screw (12) and new lockwasher (13).
10. Remove screw (18) and lockwasher (19), disconnect tube assembly (20) at remote control lever (17). Discard
lockwasher.
Figure 192
19
18
20
17
15
14
11
12
13
10
16
6
7
9
8
5