TM 9--2350--292--20--20504 00--1DIAMOND SCREW CENTERING ADJUSTMENT0504 00THIS WORK PACKAGE COVERS:AdjustmentINITIAL SETUP:Tools and Special ToolsGeneral mechanic’s tool kit (item 1, WP 0717 00)Equipment ConditionsMain winch wire rope assembly removed(WP 0499 00)Level winder guard removed (WP 0507 00)Adjustment1. Remove two thumbscrews (1) from nutguard (2) cover and raise cover.NOTEIf main winch was replaced, diamond screw shoulderscrew may not have been installed.2. Remove diamond screw shoulder screw (3) from bracket (4).3. Measure distance between end of diamond screw shaft (5) and pillow block collar (6) on brake side of winch (7).Measurement should be 0.38 inches (9.65 mm), if not proceed to step 4.4. Loosen two pillow block setscrews (8).5. Center diamond screw (9) between drum flanges (10) by adjusting the diamond screw (9) to 0.38 inch (9.65 mm)measurement at brake end pillow block.Figure 2690.38 IN. (9.65MM)156788103429
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business