Home
Download PDF
Order CD-ROM
Order in Print
Installation - TM-9-2350-292-20-2_766
Installation - TM-9-2350-292-20-2_768
TM-9-2350-292-20-2 Recovery Vehicle Heavy Full-Tracked: M88A2 (NSN 2350-01-390-4683) (EIC:ACQ) Manual
Page Navigation
727
728
729
730
731
732
733
734
735
736
737
TM 9--2350--292--20--2
0555 00--1
FLOW REGULATING VALVE AND FITTINGS REPLACEMENT
0555 00
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers
(4) (item 10, WP 0718 00)
Gasket (item 103, WP 0718 00)
Sealing compound (item 16, WP 0716 00)
Equipment Conditions
Right side engine deck grilles opened
(TM 9--2350--292--10)
Defuel access door opened
(TM 9--2350--292--10)
Hydraulic hoses removed from flow regulating valve fit-
tings (WP 0571 00)
References
TM 9--2350--292--10
Removal
1. Remove adapter union (1) from pipe tee (2).
2. Remove pipe elbow (3) from pipe tee (2).
3. Loosen pipe locknut (4), remove pipe tee (2) and pipe locknut (4) from flow regulating valve (5).
4. Remove four screws (6), four
lockwashers
(7), flow regulating valve (5) and gasket (8) from compartment wall.
Discard lockwashers and gasket.
5. Inspect parts for damage and replace as required.
Figure 301
FORWARD
1
2
3
4
5
6
7
8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business