SECTlON V: CONTROLS AND LINKAGES
TM 9-2350-256-20
17
Remove six bolts (49) and six rollers (50).
18
Remove screw (51), lockwasher (52), and tube (53).
19
Remove bearing (54) and nut (55) from one end of tube (53) and remove clevis (56) and nut (57) from other end of
tube.
20
Pry rubber boot (58) free from bulkhead.
21
Remove bearing (59), nut (60), clamp (61), rubber boot (58), and rubber bushing (62).
22
Remove screw (63), lockwasher (64), and rod (65).
23
Remove bearing (66) and nut (67) from rod (65).
24
Remove screw (68), lockwasher (69), lever (70), and key (71).
25
Remove screw (72) and lockwasher (73).
26
Remove screw (74), lockwasher (75), lever (76), and key (77).
9-175