CHAPTER 9: MAINTENANCE OF HULL-AND CAB-RELATED COMPONENTS TM 9-2350-256-209-78REPLACE/REPAIR/SERVICE ACCELERATOR CONTROLS AND LINKAGES-Continued17 Install nut (48) and bearing (47) to one end of rod (41).18 Install rod (41), flat washer (46), spring (45), lever (44), new lockwasher (43), and screw (42).19 Install nut (40) and clevis (39) to rod (41).20 Install new lockwasher (38) and screw (37) to clevis (39).21 Install bearing units (27 and 28) to shaft (36).22 Install two keys (35) to shaft (36) and install two new lockwashers (33) and two screws (32) to levers (26 and 34).23 Install two flat washers (31), two new lockwashers (30), and two screws (29) to each bearing unit (27 and 28).24 Install new lockwasher (25) and screw (24) to lever (26).9-180
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business