SECTION V: CONTROLS AND LINKAGESTM 9-2350-256-208Install key (77), lever (76), new lockwasher (75), and screw (74).9Install new lockwasher (73) and screw (72).10 Install key (71), lever (70), new lockwasher (69), and screw (68).11 Install nut (67) and bearing (66) to rod (65).12Install rod (65) with new lockwasher (64) and screw (63).NOTELinkages must be completely installed and alined and rubber boot must be adjusted(see paragraph 9-79) before cementing rubber boot in place.13 Install rubber bushing (62), rubber boot (58), clamp (61), nut (60), and bearing (59).14 Install nut (55) and bearing (54) to one end of tube (53) and nut (57) and clevis (56) to other end of tube.15 Install tube (53), new lockwasher (52), and screw (51).16 Install six rollers (50) with six bolts (49).9-179
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business