SECTION II: INSTALLATION PROCEDURES
TM 9-2350-256-20
7
Connect bent tube (15) to hose (13) with clamp
(16).
8
Connect one end of hose (17) to bent tube (15)
with clamp (18) and other end to bent tube (19)
with clamp (20).
9
Secure hose (17) to existing fire extinguisher
tubing (21) with clamp (22).
10
Install grommet (23) in opening from which rear
intermediate right access cover (3) was removed.
11
Route hose (24) through grommet (23) and
attach one end to bent tube (19) with clamp (25).
12
Remove cover (26) from hull by removing two
existing screws (27) and two lockwashers (28).
Retain screws.
13
Install adapter (29) and gasket (30) to outside of
hull with two screws (27) and two new
lockwashers (28).
14
Connect second end of hose (24) to adapter (29)
and secure with clamp (31).
15
Secure hose (24) to bulkhead with clip (32), new
lockwasher (33), and screw (34).
16
Connect adapter (35) to adapter (29) using
spanner wrench (Table I-1, item 10).
17
Attach seal (36) to adapter (35) with clamp (37).
18
Wrap asbestos tape several times around
personnel heater exhaust (38), applying sodium
silicate (Table I-1, item 6) while wrapping.
I-11