TM 9--2350--292--20--2
0667 00--1
DEEP WATER FORDING KIT
0667 00
THIS WORK PACKAGE COVERS
Pre--Installation, Installation, Removal, Service, Installation of Subfloor Plates, Engine Deck Grilles and
Engine Deck Doors
INITIAL SETUP
Tools and Special Tools
General mechanics tool kit (item 1, WP 0717 00)
Materials/Parts
Lockwashers (10) (item 2, WP 0718 00)
Lockwashers (32) (item 12, WP 0718 00)
Lockwashers (12) (item 9, WP 0718 00)
Dry--cleaning solvent (item 1, WP 0716 00)
Plastic bags (AR) (item 48, WP 0716 00)
Adhesive (item 6, WP 0716 00)
References
TM 9--2350--292--10
TM 9--2350--292--24P
TM 9--1005--213--10
FM 23--65
Pre--Installation
1. General
This section provides instructions for the M88A2 Heavy Recovery Vehicle and its component parts to determine
whether all assemblies, subassemblies and accessories are properly assembled, secured, correctly adjusted and lu-
bricated.
NOTE
Do not reinstall engine deck grilles and doors removed
during the pre--installation procedures. Access to engine
and transmission compartments is necessary during sub-
sequent kit installation.
CAUTION
When engine deck is removed, the engine cooling fans
must be suitably protected to avoid the entrance of for-
eign material into the fans, clutches, associated parts, or
any openings.
2. Inspection Procedure
a. Perform Preventive Maintenance Checks and Services (TM 9--2350--292--10 and WP 0187 00).
NOTE
Replace any of the items listed that do not provide a wa-
tertight fit.