TM 9--2350--292--20--2
0667 00--14
DEEP WATER FORDING KIT -- CONTINUED
0667 00
Installation--Continued
VENTILATION BLOWER SEAL AND BOOM FOOT DRAIN SHUTOFF CLAMPS
1. Tape VENT BLOWER switch (1) on the Accessories Panel (2) in the OFF position.
NOTE
Note the quantity and position of shim(s) being removed
to ensure shim(s) are installed in the same position.
2. Remove three screws (3), three nuts (4), three flat washers (5), three lockwashers (6), ventilation blower assem-
bly (7) and shims (8) from elbow mount (9) and inlet port (10). Retain screws, nuts, flat washers, ventilation blow-
er assembly and shims. Discard lockwashers.
3. Apply caulking compound (11672186) to seal (11). Install seal (11) in inlet port (10). Tighten four screws in seal
(11) until a watertight fit is obtained.
4. Position shims (8) and ventilation blower assembly (7) on elbow mount (9) and at inlet port (10), secure with three
screws (3), three new lockwashers (6), three flat washers (5) and three nuts (4).
5. Install one shutoff clamp (12) each on ventilation blower drain hose (13) and right and left boom cylinder boot
drain hoses (14). Tighten shutoff clamps (12) to close drain hoses (13 and 14).
Figure 36
Figure 360
3
4
5
6
7
8
9
10
11
14
12
13
12
1
2