TM 9--2350--292--20--20667 00--15DEEP WATER FORDING KIT -- CONTINUED0667 00Installation--ContinuedBILGE PUMPNOTERemoval and opening of subfloor plates (as required) andstowage baskets removal will be necessary for the instal-lation of the bilge pump hoses.Route hoses and tubes from bilge pump assembly towardopening in subfloor (4).1. Remove subfloor plates #18 and #27 (WP 0454 00).2. Remove and stow three screws (1), three flat washers (2) and access cover (3) from subfloor plate (4).3. Remove and retain two screws (5), two flat washers (6) and plate (7) from subfloor plate (4).123456567
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business